by Alison South | Jul 17, 2023
65,000 ft² The design of this two-story charter school prioritized optimal efficiency through the implementation of high-efficiency, variable refrigerant, one-to-one systems, strategically decoupled from the main ventilation system. This innovative approach enables...
by Alison South | Jul 17, 2023
210,000 ft² This new educational facility, spanning 210,000 square feet over six, multi story buildings, accommodates students from kindergarten through the 12th grade. The 85 classrooms and associated faculty spaces were served by VAV air handlers with dedicated...
by Alison South | Jul 17, 2023
300,000 ft² Air-cooled chillers were used in the design of this 3-story high school serving more than 3,500 students and faculty. A noteworthy aspect of this project entailed seamlessly integrating the new structure with the existing buildings, which were...
by Alison South | Jul 17, 2023
65,000 ft² This historic entertainment venue with a capacity of 2,700 people required a mechanical renovation of the 25,000 ft² auditorium. This project involved the replacement of a 250-ton chiller, repair of existing cooling towers, and an upgrade of all other HVAC...
by Alison South | Jul 12, 2023
34,000 ft² ING’s top priority in healthcare design is safety and comfort for both patients and staff. Those considerations are exemplified in the HVAC, plumbing, medical gas and fire protection systems designed for this new emergency department at South Georgia...